The Writing Shed, Part Two


I’ve had a lull in my brainiac works, so I’ve been able to get some work done on the writing shed.

I started off by disrobing part of my yard with a sod cutter. Once it was nude, I had to level the site, which I accomplished with a shovel and rake. I then located the first foundation stone. I used some cinder blocks I’ve had sitting around for a few years; they’re good enough for what I’m doing. I dug ‘em down a few inches and made sure they were tamped in well, and level.

Since I didn’t have a transit handy, I used the straightest reclaimed piece of 2x8 I had on hand to telegraph the elevation from the cornerstone to all the remaining foundation stones. I placed my four foot level on top of the 2x8 and voila: it’s a 12 foot level. Mind you, I wasn’t aiming to get each stone perfectly in position—just close enough to be able to shim the floor after it was built. The goal was to get all six stones roughly at the same elevation, within less than a quarter of an inch of each other relative to the cornerstone. The Egyptians would probably ridicule such lax tolerances, but this is good enough for who it’s for.

The next step involved the Pythagorean Theorem. In framing, we call it the 3-4-5 rule. Basically, in order to find the hypotenuse of a right triangle, pull measurements on each 90 degree leg that fulfill the 3-4-5 rule, like so: if one leg is 3 feet, and the leg 90 degrees from that is 4 feet, the hypotenuse (the side of the triangle that connects the two right angle legs) has to be 5 feet. If it’s not, you don’t have a right triangle, and your framing isn’t square. In my case, I pulled 6 feet on one side and 8 feet on the other, and moved those two legs until the diagonal (the hypotenuse) yielded 10 feet (notice that these are multiples of 3-4-5). I had to do this several times, confirming the placement of my foundation stones.

Once all the stones were reasonably situated (of course, one of them refused to cooperate, but that’s par for the course), I could begin building the frame. The reclaimed materials bundle that I have managed to procure came ready-made with a doubled-up 2x8 joist; perfect for the backbone of my floorplan. I cut it to length and began laying out the framing, nailing it together as I went. Now, lots of guys would probably tell you to use hangers, but I elected to save some scratch and toenail (drive nails in on an angle, one from each side) the floor joists together, gluing them after they’d been nailed. Cheaper and faster, and arguably just as strong. You’ll notice from the photos that using reclaimed lumber means putting up with random holes (drilled for electrical in the previous installation), but they don’t affect the strength.

My next step was insulating the floor, which was interesting. I used 24” wide batts and installed them upside down, so that the kraft paper faces the ground. Hopefully that will increase durability. I had to buy insulation supports, which are just lengths of steel stock that you wedge into the joist spaces that act as a spring and support the weight of the insulation. It’s lame and I hate it, but it’ll do.

After all that was done, I busted out the 3-4-5 rule again and made sure my framing was reasonably square. Sure enough, it had gone slightly trapezoidal, but I could easily rack the thing into shape using a length of 2x4 as a lever, prying against the ground and moving the corners back into square. Further fine tuning was accomplished by using the factory edges of my sheathing (the OSB floorboards) as a guide. It went pretty quickly once I got the first sheet lined up with the framing and nailed down. I used construction adhesive, gluing as I went along, lining up the sheathing and then nailing it down.

Now that the deck is done, I should be able to run electrical pretty soon. Since this big 12x12 deck is nice and level and flat, I’ll be building my trusses before I build the walls, and then setting them aside until I’m ready to build the roof. I need something like a huge workbench in order to fabricate those, and the shed floor fits the bill perfectly. The next installment in this series will chronicle that. 

Wednesday, June 20, 2012

The Writing Shed, Part One


Reduce! Reuse! Recycle! AAGGHHH!

Ever had that feeling that life is snowplowing right over you? The old to-do list is getting pretty long. It brings to mind a British phrase I’ve come to know and love: “Ambitious, but rubbish.” If things keep up like this, that’s precisely what it’ll be.

I’ve been trying to build an outdoor fireplace now for a little while. Like, two years. It’s not only not done, but also there have been other little projects added in the meantime… you know, while I procrastinated. Like the cabinet my wife procured that needs to be sanded, painted, and installed somewhere. A big picture frame from three years ago; same story. I’ve told my boys that I’m going to build them a loft bed in their room, so they can have more room to play (truthfully, the design behind this idea is to keep them from leaving Legos out to ambush me barefooted in the living room, but I know it won’t solve anything; I understand the Law of Unintended Consequences).

And now this: A massive pile of reclaimed lumber. It’s for another project altogether, of course. See, a while back I got this crazy idea that I could build a storage shed that’s mostly not a storage shed. Mostly, it would be my home office. There would be room to store stuff on one side, sure, but there would be a double wall dividing the two spaces. My office space would be insulated and air conditioned and heated. Sure, it’s crazy, but I can do crazy in my sleep. Trust me.

Where did it all come from, you may ask. It started with a random phone call from my brother, who started the conversation by asking me what I was doing. I told him, “Writing. At the coffee shop (which is where I normally work because I don’t have a writing shed yet).” He replied with, “You dog,” whereupon I gave as good as I got. But it turned out he needed some help with demolition at one of his jobs. There was a small forest of 2x4s, 2x8s, and headers, oh, my. The stuff was just going to go into a dumpster anyway, so I quickly volunteered to help him take it down, thinking to myself, self, this is probably going to cost you a bottle of Laphroaig’s finest. Happily.

The problem is, reclaimed lumber is a little like fresh produce. It won’t keep forever, especially out in the weather. Further, my projects tend lately to outlast reality itself. I have really got to get cracking on this shed, then. Have you ever considered the irony of a man who needs somewhere to keep the materials for the shed he wants to build, and how a shed would be the perfect place to keep all that stuff but how there is no shed yet because it hasn't been built? Chicken or egg. A Frenchman would shrug, turn away, and light a cigarette, saying C'est la vie, and it would fit well.

That pile looks big, doesn’t it?

Yes, yes it does.

But I’ve counted up the studs and the joists—there’s not enough there to complete the shed I’ve designed. It’s not a complaint; just an observation. What it means is that I’ll have to go out and buy more materials. More studs. More sheathing, for sure. Shingles, paint, caulk, nails, hardware for the doors, and so on. I’ve got to go get a second-hand sliding glass door, too. And a heater. And an air conditioner. You see where this is going, right? I’ll need conduit, wiring, j-boxes, some railroad ties, and probably more than a few sixers of cold beer.

It’s dangerous, that’s what it is. Dangerous. Because I have more excuses than ever now. And if there’s one thing I don’t want to do, it’s procrastinate this lumber pack into an unusable pile. Though life threatens to plow me under, I shall stand atop victorious, hammer in one hand and empty beer in the other, roundly belching my defiance into the face of circumstance. I will shout from the gambrel roof of my writing shed that I Have Overcome. Soon. Ish. Like, maybe, I dunno, late August-early September. Meh, October…possibly.